Metro Service Territory · 24/7 Response

Commercial-only plumbing for facility managers, GCs, and property management companies who can't afford a single hour of downtime.

Get a Site AssessmentSee Our Certifications
Scroll
0min
Average Emergency Response
0 GPM
Flow Capacity Restored — Single Project
0
Active Commercial Accounts
0
Unplanned Shutdowns in 8 Years

Commercial work only. No exceptions.

Every technician on this crew has spent their career in mechanical rooms, not residential bathrooms. That's not a marketing line — it's the hiring requirement.

24 / 7

Emergency Commercial Response

Dispatch within 47 minutes to any commercial site in the metro territory. 24/7, including holidays.

Multi-story

Riser & Main Replacement

Staged riser work executed across occupied buildings — floor by floor, weekend windows, no tenant displacement.

Code compliant

Backflow Prevention & Testing

ASSE 5110 certified testers. Annual reports filed directly with the municipal water authority.

Zero disruption

Active Facility Work

Server rooms, hospital wings, occupied office towers — we engineer around uptime requirements before the first pipe is touched.

HD video

Sewer Scope & Inspection

High-definition camera inspection with timestamped video reports. Every defect mapped to a floor plan.

Hospital-grade

Medical Gas Piping

ASSE 6010 certified for medical gas installation and verification in healthcare facilities.

The work speaks for itself.

Drag the slider on each project to see the problem we walked into and the infrastructure we left behind.

Corroded cast iron drain pipe with heavy rust and mineral buildup
New PVC drain installation with clean joints and proper slope
Before
After
Scale 1 of 3 — Tenant Improvement

Cast Iron to PVC — Restaurant Row Retrofit

A 14-unit food hall opened with corroded 4-inch cast iron drains backing up into neighboring tenant spaces. We cut the concrete floor at 11 PM, replaced 180 linear feet of drain line, and poured new concrete by 5 AM. Every restaurant opened for breakfast service.

180 LF replaced6-hr turnaround14 tenants protected
Get a Site Assessment
$2.4Msaved

Repair vs. Replace — 6-Inch Cast Iron Main

Full main replacement was quoted at $3.1M. Our slip-lining approach delivered the same 50-year service life for $680K. The facility manager kept the remaining $2.4M in the capital reserve.

Get a Site Assessment

14-Story Domestic Water Riser — Mid-Occupancy

The building's 2-inch galvanized risers were delivering 18 PSI to the fourteenth floor. Tenants filed 23 pressure complaints in 60 days. We staged the replacement floor by floor across three weekends — no tenant relocated, no lease broken, pressure restored to 65 PSI throughout.

14 floors serviced65 PSI restored3 weekend shutdowns
Get a Site Assessment
Old galvanized steel pipe with heavy corrosion and scale buildup inside
New copper riser installation with properly soldered joints and pipe supports
Before
After
Scale 2 of 3 — Full Riser Replacement
47min

Average Emergency Response to Commercial Sites

Across 142 active accounts in the metro territory. Our dispatch operates 24 hours — not a call center that routes to an on-call tech at 3 AM.

Get a Site Assessment
Server room floor with existing pipe routing beneath raised floor panels
Completed pipe reroute with new grooved fittings and pipe insulation in mechanical corridor
Before
After
Scale 3 of 3 — Ground-Up New Construction

6-Inch Main Reroute Beneath Active Server Room

A data center expansion required relocating a 6-inch domestic main running directly beneath 400 servers that couldn't be taken offline. We engineered a bypass in a parallel corridor, executed the tie-in during a 4-hour maintenance window, and rerouted without a single second of unplanned downtime.

6-inch main4-hr window0 seconds downtime
Get a Site Assessment

Every credential, on record.

See Our Certifications

State Licensed Master Plumber

License #MP-44821 · Issued by State Board of Plumbing Examiners

Valid through 2027

IAPMO Certified

International Association of Plumbing & Mechanical Officials

Certified since 2014

General Liability — $5M

Commercial general liability coverage for all commercial work

Certificate on request

Backflow Prevention Certified

ASSE 5110 · Certified testers for all device sizes

Annual recertification

Medical Gas Certified

ASSE 6010 · Medical gas piping installation

Hospital-grade work

OSHA 30 — All Field Crew

Every technician holds current OSHA 30-hour construction card

Renewed every 4 years

Ready for a site assessment?

No form on this page. One click gets you to a detailed estimate request — with everything your procurement department needs to issue a PO.

Get a Site AssessmentSee Our Certifications
Next Step

One click to a detailed estimate request.

No form on this page. The next page gives your procurement team everything they need — scope of work options, timeline windows, and insurance certificates ready to download.

Get a Site Assessment